Energy Modelling
Predictive energy modelling for data centres that delivers the certainty to design efficiently, meet regulatory requirements and achieve sustainability certification.
What is energy modelling?
Energy modelling for data centres is the process of building a detailed digital model of a facility to predict how it will consume energy, generate carbon emissions and perform under real operating conditions. It gives engineering teams and clients a quantified, evidence-based picture of building performance before design decisions are finalised.
For data centre projects, energy modelling is both a design tool and a compliance requirement. It informs cooling strategy, equipment sizing and systems integration decisions at the stages when they can still be meaningfully influenced. It provides the technical evidence required for building regulations compliance, planning submissions and sustainability certifications including BREEAM and LEED.
What we deliver
We provide a full range of energy modelling services for data centre projects, from operational energy assessment through to loads analysis, thermal comfort and daylight modelling. All modelling is carried out using IES-VE and Pleiades, selected and applied according to the specific protocol, geography and certification requirement of each project.
Our credentials
–Energy modelling for data centres delivered across projects in multiple geographies and regulatory environments, including UK, France and internationally
– Modelling carried out using IES-VE and Pleiades, industry-leading platforms selected according to project protocol and certification requirements
– Experience across ASHRAE 90.1, CIBSE TM54, UK Part L and France RE2020 modelling protocols
– Integrated with our BREEAM and LEED certification teams, ensuring energy model outputs directly support certification submissions
Talk to our team about your project needs
Our specialists deliver energy modelling for data centres across concept, design and certification stages providing the analysis and compliance evidence your project requires, in any market
Let’s talk